How to Use CLAY FIXER: Soil Preparation, Rates and Aftercare

Use CLAY FIXER when clay spreads into cloudy water or sets hard and stops water soaking in. Check the cause first, wet the soil and spread the measured amount evenly. Retail and PRO versions are applied in the same way, but use different amounts.
Quick start: wet the soil, then apply
- Check the problem. Clay that spreads into cloudy water and forms a sealed surface needs different treatment from water-repellent sand, a blocked drain or a high water table.
- Measure your area and read the product name. Check whether the bottle says CLAY FIXER or PRO CLAY FIXER. The size of the bottle does not tell you which version it contains.
- Wet the soil well first. Apply after enough rain to wet the soil, provided it is not flooded or waterlogged. Otherwise water gently first and let it soak in.
- Mix the measured amount with clean water. Apply evenly with a watering can or a suitable sprayer that you have checked for even coverage.
- Water in gently if needed. Use enough water to carry the treatment from the surface into the soil, without puddles or runoff. Allow normal drainage and drying between watering cycles.
Choose the right product and amount
| Soil condition | CLAY FIXER | PRO CLAY FIXER |
|---|---|---|
| Open / turned soil | 5 mL/m² | 2 mL/m² |
| Compacted / severe conditions | 10 mL/m² | 5 mL/m² |
These amounts refer to the product before adding water, for each square metre of ground. For 100 m², the first row means 500 mL retail or 200 mL PRO; the second means 1 L retail or 500 mL PRO. Do not add both rates.
The retail technical sheet specifies at least 1 L of application water per m². A practical retail watering-can example is 45 mL in 9 L for 9 m² at 5 mL/m², or 90 mL in 9 L for 9 m² at 10 mL/m². Spread the whole can evenly over that measured patch. Check the PRO pack’s water-volume directions separately.
Do not apply this much water to already waterlogged soil. Wait until it can soak in. Adding more water does not mean you should add more product.
Go deeper
What it is for, and what it cannot fix
Sodic soil has too much sodium attached to its clay particles. This can make soil crumbs break apart in water, seal the surface and set hard as they dry. Water then struggles to soak in. Not all clay is sodic, and not every hard patch has the same cause.
Use the home dispersion check for an initial check, not as a replacement for a laboratory soil test. For large areas, salty soil, valuable crops or construction sites, get advice based on soil-test results. CLAY FIXER does not replace drainage repair, loosening severely compacted soil or an engineer’s design for the ground beneath a structure.
Prepare the site and choose the timing
- Move loose mulch aside where it prevents liquid reaching soil, then replace it after application. Do not excavate or damage established roots.
- Choose settled weather so the treatment has time to soak in. Avoid heavy rain likely to cause runoff.
- Do not cultivate, drive over or repeatedly walk on sticky wet clay. Wait until it is workable.
- On slopes or sealed patches, use gentle, staged wetting instead of applying faster than the soil can absorb.
Equipment, mixing and combinations
Use clean equipment kept for applying these products. Measure the area first, then test your watering can or sprayer with plain water to see how much it takes to cover that area evenly. A hose-end dial controls the mixing ratio; it does not tell you how much product reaches each square metre.
If using a Holman sprayer, follow the separate 450 mL and 1 L model instructions. Do not substitute one model’s chart for another. Avoid spraying in wind that carries liquid away from the target.
Use clean water and apply products separately unless both current labels permit the combination. Mixing a small amount in a jar can show whether products separate or form solids, but it cannot prove the mix is safe for plants or equipment. Test unfamiliar combinations or sensitive plants on a small area first.
Repeat treatment and judge the response
The retail technical sheet allows monthly treatment while the soil stabilises, then review the need rather than treating indefinitely by habit. Disturbance or renewed sealing may justify reassessment. Follow the directions for your product version.
- Record the area, product version, amount used, water volume and date.
- Compare water-entry time and wetting depth before and after under similar conditions.
- Check roots and surface crusting over time, not just appearance on application day.
- If water still ponds, check drainage, compaction and sodicity instead of simply increasing the dose.
Handling, storage and cleanup
Wear protective gloves and eye protection when handling concentrate; avoid splashes and contact. Keep children and pets away from concentrate and application equipment. Keep product and equipment rinse water out of drains and waterways.
Store upright, closed and labelled in a cool sheltered place, away from food. Protect from frost and temperatures of 40°C or hotter. Rinse equipment promptly according to its manual and use the current safety sheet for spill and first-aid directions.